James P. Donnelly

James P. Donnelly's Posts

Renovation Adds Space and Value to Parking Garage

Until the summer of 1997, the two-story attached parking garage of Park Place Tower, a residential high-rise in Chicago, contained only 600 parking stalls for the residents of the tower's 900 deluxe apartments. Read more

Posted on:
Exterior Plazas: Problems and Solutions

Poor construction or design increases the vulnerability of a plaza to temperature changes and precipitation. As a result, many plazas require significant repairs or replacement in 10 to 20 years, much sooner than many other components of a facility. Read more

Posted on:
Close X