Robert Pierce

Robert Pierce's Posts

Better from Above

A unique bridge overhang forming system that does not require construction personnel to work from underneath is speeding work, reducing labor hours, boosting safety, and improving concrete quality in the building of a four-level interchange at I-35E and the new President George Bush Turnpike (SH 190) in Carrollton, Texas. This is the first application of the reusable all-steel system, manufactured by Symons Corp., Des Plaines, Ill. Read more

Posted on:
Close X