When a 90-year-old concrete tunnel developed a "car-sized" hole beneath the Chicago River, 250 million gallons of water rushed through the 50-mile tunnel system. After attempts to fill the hole with stone and then with rapid-setting concrete did not completely stop the leak, a foundation subcontractor permanently sealed off the damaged are with three concrete plugs.