Implementing a bulletproof plan is critical to the success of a tilt-up project, especially on a large, fast-track job. The author, president of a successful tilt-up contracting firm in North Carolina, presents five essential steps to developing an effective plan. They include reviewing the structural drawings, preparing shop drawings and materials submittals, jobsite staging, planning crew size and sequencing, and planning tool and equipment needs.