Download PDF version (41.1k). The full text of this article is available as a PDF document.
An in-depth study of basement water leakage showed that most builders involved in basement construction have had leakage, most within six months of construction completion. The National Association of Home Builders (NAHB) presents a seven-point plan to prevent leakage.