Could a mix of concrete that is too old (2 hours or older) be mixed with a fresh load of the same mix design?
Remixing would produce concrete with some intermediate workability but it would not overcome the problem that the older concrete is on the verge of setting. Thorough mixing would require using a third mixer truck, entailing a great amount of effort and producing an inferior concrete.