Often when we stop the pump for any length of time between deliveries of concrete we have a lot of trouble with plugged lines. We can't always avoid these delays. Is there a good way to prevent the trouble?
Keep the hopper as nearly full as possible. Whenever there is a temporary halt in pumping turn over the concrete in the hopper occasionally and pump a small amount through the line to keep it from stiffening.