What can be done to locate bolts and dowels that normally extend above the panels which must be stacked for casting?
A substitute method for protruding bolts or dowels would be to embed a threaded anchor of equivalent structural value. Attachment is then made by the bolt or threaded dowel into the embedded anchor after the panel directly above has been removed.