What would be the most likely reason for the deterioration of a terrazzo floor within a year or two of completion?
There could be many causes, but the most likely one is improper curing. One of the important objectives of curing in terrazzo work is to prevent the surface from drying out between the various grinding and polishing operations. Even after these operations are completed, it is advisable to postpone the drying out process as long as possible.