With the placement of a 72-foot-diameter plastic sheet between two concrete slabs, “something new has been achieved in the field of water-barrier construction,” heralded a March 1961 news item. The circular sheet, fabricated onsite for a 560,000-gallon reservoir, was sandwiched between a bottom layer of 2-inch-thick unreinforced concrete and a 4-inch slab of reinforced concrete.