The ready mixed concrete producer with whom I do business reuses wash water in subsequent batches. Is this permissible?
He is probably just doing his best to comply with the demands of the ecologists. There seems to be no evidence that this practice is harmful, and there is at least a chance that the partly-hydrated cement in wash water might make a small contribution to the strength of the following batch.