Berlin City Palace

For the reconstruction of the Berlin City Palace, PERI supplied formwork and scaffolding. The project could be finished by early 2018, and open up to the public as soon as 2019.

Due to the PERI solution with external CB Climbing Platforms, no facade scaffolding for the shell construction was required. For the circular reinforced concrete walls of the cupola, RUNDFLEX Circular Formwork together with FB 180 Folding Platforms were used.

Sustainability and energy efficiency are a top priority in the building project. The plans include, for instance, a geothermal energy system that reduces the consumption of fossil fuels and consequently decreases CO² emissions by utilizing ground heat.

The MAXIMO Wall Formwork system and QUATTRO Column Formwork allowed fast and safe construction of the vertical reinforced concrete components.

Lightweight and flexible SKYDECK and MULTIPROP system components made of aluminium saved both time and money when forming the storey slabs.