For the expansion of a power generating station in Holtwood, an intake structure complete with six sluices is being constructed.

PERI supplied the Variokit heavy duty tower bents pre-assembled thereby ensuring assembly time on site was kept to an absolute minimum.

Due to their high rigidity, Variokit heavy duty towers can be lifted as complete units by crane. This allows fast and safe assembly.

Thanks to the compatibility with the PERI UP modular scaffold system, all required tower working platforms are quickly and safely installed.

n the course of the Holtwood hydroelectric power station expansion, six intake channels as well as a new powerhouse are being constructed. For the construction of the massive walls, various PERI wall formwork systems and climbing scaffolds are utilized.