Panama Airport Expansion

Bridge Expansion Joint

Curb demolition on existing structure in Corredor Sur, exposing existing 15-year-old strip seal joints in preparation of bridge widening for the Tocumen Airport’s New Access.

This 15-year-old SSCM2 Steelflex System performed without any maintenance.

Close X