Southeast Collector Trunk Sewer Project

Doka’s custom formwork solutions and the good teamwork between Doka and Strabag made this project a success.

Custom Top 50 can be constructed to accommodate any wall design and produces excellent final results as depicted here.

Doka supplied custom benching formwork for 13 ventilation shafts, ranging between 10 to 60m depth.

Using custom Top 50 formwork panels allowed Strabag to pour the U-shaped benching at the bottom of each ventilation shaft connecting the newly drilled tunnel opening with each other.

Doka secured this project due to their expertise in 3D engineering design and custom-built formwork solutions.

Each custom formwork element was preassembled in Toronto.

Close X