Total Stations Save Foundation Contractor

Walrite’s Craig Poortinga laid out 45 points on two footings with a three-man footing crew for an estimated time savings of seven man-hours.

Walrite’s Bill Pipe uses the robotic total station system to easily and precisely lay out a foundation.

Craig Poortinga uses the robotic total station to lay out more than 60 points on this footing within 1/8-inch tolerance.

Checking for square on a foundation.

Close X