Buck Sweet, a poured wall contractor, makes wall forming and stripping as easy as possible for his crew. By using specially designed cribs to hold the forms, and a truck-mounted crane to move the cribs, he has eliminated most of the hard-lifting grunt work. With the crane doing all the heavy work, a two- or three-man crew can handle most jobs depending on the tasks being done. Emphasis is on efficiency.