ModernCrete was asked to complete floors in a single-family five-story home in Austin, Texas, on Lake Travis. The owners had a very detailed drawing for us to work off of for our design layout and colors. It was stained with Kemiko Acid Stain and a buff on paste wax was applied. The project took approximately two weeks to complete with a three-man crew. The only complication came when the contractors protected the floor with ducktape stuck down onto the concrete. It was left on for several months and removed some of the color when it got pulled up. We were able to touch it up at the end of the project without issue.