The solution for future transportation problems in larger metropolitan areas, believes Linda Figg, president of Figg Engineering Group, Tallahassee, Fla., rests with the Lee Roy Selmon Crosstown Expressway, now being constructed by the Tampa Hillsborough Expressway Authority in Tampa, Fla. It’s a 5-mile-long bridge being constructed in the median of the existing tollway; it will add three reversible lanes for traffic going into and out of Tampa each day. The bridge will reach as high as 70 feet, providing great views of the city. And, best of all, it’s all concrete!