Located in the center of Washington State University’s Championship Palouse Ridge Golf Club, the sustainably designed Clubhouse, with pro shop, restaurant, and outdoor terraces, provides expansive views of the stunning golf course and picturesque Palouse hills. It is fast becoming a destination for...
A $3.9 billion hotel/casino features state-of-the-art amenities such as condo style rooms,conventionand meeting space,casino, 50,000 sq ft spa& fitness center,275,000 sq ft retail, restaurant and entertainment space. Located on Las Vegas Blvd surrounding the exisiting Jockey Club timeshares.
Classroom concrete restoration along with removal of the checker print left by the vinyl tile and concrete glue of 7500 Square Feet.
Place, finish, and polish with exposed large aggregate the SOG hangar floor containing integral heat, integral color, and special aggregate
This state-of-the-art facility for renowned culinary arts program at Los Angeles Mission College consisted of teaching laboratories, classrooms and the campus dining facilities, to maximize the practical application of the education program, the demonstration kitchens adjacent to the public areas...
Old glue down carpeted and cubicled office space was repurposed to architectural firms new conference room and reception area. Elevated slab with floor damage from cracking and removal of shot down sill plates from former cubicle walls. Damage repair was incorporated into floor art using stain, dye...
New technical and career high school with diamond ground exposed polished aggregate stained to abstractly represent the two rivers after which the school district is named. Concrete finishing was not as specified so substantial corrective and adaptive grinding was incorporated into final product.
Old shopping mall space, formerly a pharmacy with VCT. Rehabilitated and repurposed to specialty retail. Repaired cracks and defects using a combination of techniques, green polyurea to represent grass with fractured colored glass inlays. Two large areas of spalls were decoratively addressed by...
Badly worn stairwells and landings were rehabilitated by grinding, polishing and staining as an alternate to remove and replace. Large cost savings to USAF. One stairwell was done as a proof of concept. After the trial stairwell had spent a year in service we were contracted to rehab two additional...
Shop/Loft rehab with multiple techniques and materials. Fused glass salmon inlaid and polished into spawning stream at bathroom tub. Intrinsically valuable found objects inlaid and polished in living room floor. Geometrically patterned and colored floral suggestions stained into kitchen floor.
A storage facility in Arizona wanted to do 100,000 square foot facility with cutting edge technology and sustainability. No one in the area has done anything like this at this size. The owner liked the light reflection benefits that polished concrete had to offer. We had to complete our work before...
Custom placed, seeded, sawcut, dyed, ground and polished floor from the dirt up for new 4000 sq.ft. organic grocery store.
This 23,000 ft. athletic facility required removing the existing epoxy, putting new court lines down, dying the courts, and polishing the entire surface.
Brand new 90,000 Sq. ft. storage building - 3 floors, in Halkensick, N.J.
A polished, cut, and dyed project with a 6' diameter etched logo.
6000 sqft of black concrete seeded with recycled computer chips,complete with brass inlays and fiber optic lighting.
Work on the 500,000 sf Uline warehouse in Buford, GA began with extensive joint repair, degreasing of the existing slab to remove old oil staining, and a wet diamond grinding to remove existing bond breakers and tire markings from the concrete. In addition, the slab had a continued sweating issue...
The Catholic Cemeteries of Brooklyn and Queens were building anew welcome center at the St. Charles Cemetery in Farmingdale, NY just ouside New York City.
Phase 1 of a 325,000 square foot project, the Arts?Center consists of a state-of-the-art auditorium seating 850, and wings of classrooms for the music and fine arts programs. It has been designed and constructed with energy conservation in mind and is eligible for "CHPS" (Collaborative for High...
Concrete polishing of a student services building for a University in Los Angeles.
Breathtaking Mechanically Polished Concrete and leading edge architectural design combined to make a joint statement for sustainability and portrayal of elegance,and modernity. Pro Grind Australia delivers a flooring contribution certain to outlast, outperform and outshine any other flooring...
The Florida International University Parking Garage will feature a dining hub with indoor and outdoor seating, three classrooms and the upper levels will be used for parking.
Bulach Custom Rock polished more than 30,000 square feet of interior flooring at The Legends Club Lounge at the Target Field in Minneapolis, Minnesota.
Kent Companies Inc. was contracted by Rockford Construction to install 180,000 square feet of interior concrete floor for the new Meijer store in Stevensville, Michigan. Following floor placement, Kent Floor Specialties crews were brought in to polish to a Class B "salt and pepper" finish to 140...
15 sq. ft. bathroom, custom designed cast concrete tile installed over radiant slab. Floor tile polished on site. Wall tile (border, trim and field) polished in shop. All tile brought to 600 diamond finish
The Honolulu Zoo gift shop features rammed earth walls, natural ventilation and daylighting. It was a design-build project, and involved close collaboration between architect and contractor. The gift shop’s structural materials: steel, concrete, and wood, are left exposed, and painted or sealed to...
This project was performed on an existing residential three car attached garage. The floor was polished exposing the small aggregate, dyed and sealed.
Designed by San Diego based h2a architects, north island credit union's new 6 story 130,000 sq. ft. headquarters incorporates many "island-inspired" elements as well as an array of environmentally friendly features. This project achieved LEED silver status from the USGBC.
T.B. Penick created a showroom space at their new location.
T.B. Penick & Sons, Inc. completed a $9m combat training tank complex at MCAS Miramar. The project was administered as a design build through the naval facilities engineering command southwest.
UCSD North Campus Housing is a $93m student housing design build project constructed by turner construction, T.B. Penick structural and HD flooring by T.B. Penick innovative concrete systems. The design included provisions for a LEEED silver certification.
Elevated slab, radiant floor heat, diamond ground exposed polished aggregate stained to complement owners stone counter top. Unprotected slab with freezing temperatures at night.
Diacon was contracted to install 270,000 sq. ft. of Retroplate polished concrete at Solyndra solar manufacturing within 45 days on a tight time frame job. Numerous challenges were encountered along the way, that created innovative solutions to issues not usually encountered. In addition, a visit by...
We were asked if we could imitate on the floor the Brisbane airport runway which is situated between to water lakes when approached by plane. This was an information centre shaped with a plane over the runway. So to their surprise we could easily design a polished concrete floor art with water to...
Remove existing double broadcast color quartz floor system and polish the concrete floor with exposed large aggregate. The job included Installing a large corporate logo using concrete dye.
Remodel project on ORU Mabee center. This 105,000sq ft arena was built in 1971. The center houses ORU Golden eagle basketball and holds many major Tulsa area events. The polish project was completed, in two phases, one 30,000 and one 5,000 sq ft. The first phase around the upper entrance...
The project consisted of 3,000 sq ft of polished concrete flooring, shower floors. 500 feet of baseboards to match.
150 + sq ft of Matching counter tops, vanity tops tub aprons and back splashes. Because the design is so contemporary the the floors has to be within a 16th of an inch in order that...
MBW performed a high-level polish to acheive the architect's vision for a modern look in newly renovated addition to the Oceanside Museum of Art.
The goal of our project was to create a warm, rich and unique surface that would add to the depth and enhance the rooms while complementing the designers/clients styling.
Sarasota's Firestation #10 was the flagship project that would set the standard for future GREEN Firestation projects in Sarasota County. Edwards Concrete Company was uniquely qualified to complete the project for Sarasota County Public Works.
The Village Bike Shop Specialized Bicycle Concept S-Works Store in Jenison Michigan allowed us to work to develop the most striking statement of design and function to a truly unique space.
Edwards Concrete Company restored a diamond polished finish to 120,000 sq. ft. of original concrete floor that had been placed over twenty years in the Daytona Beach Sam's Club #8128 for the Walmart Stores Corp.
In this mid-century, classic ranch home we created a modern space by hand troweling the floors, which reveled subtle character and complexity.