Using tunnel forms for the first time, Blake Construction Co. Inc., San Diego, built an 11-story, concrete-frame residence hall in 16 months. The hall, completed in September 1992, is located at San Diego State University. Blake completed the structure on schedule, building a 30-room floor every 6 days, on average.