Kate Cline

Kate Cline's Posts

  • Products Solving Problems

    Norfolk Southern embarked on a $150 million project to increase the height of 28 of its Appalachian tunnels and ensure that they will be safe and stable for another 100 years.

  • A 2003 physical survey of the Oklahoma City section of Interstate 44 proved to the Oklahoma DOT (ODOT) that the road was in desperate need of repair.

  • Products Solving Problems

    A survey of the Oklahoma City section of I-44 proved to the Oklahoma Department of Transportation (ODOT) that it was in desperate need of repair. Their solution: concrete pavement restoration (CPR).

  • The Arena Stage renovation project in Washington, D.C., presented Clark Concrete Contractors, Bethesda, Md., with unusual challenges: In addition to renovating two theaters and constructing a new elliptically shaped theater that involved complex concrete designs, the company had to consider acoustics in the design plans.

  • Products Solving Problems

    The Arena Stage renovation project in Washington, D.C., presented Clark Concrete Contractors, Bethesda, Md., with unusual challenges.

Close X