When completed in 2016, the new 3,800-foot concrete-reinforced tunnel will provide a separate road that allows two lanes of traffic in both directions, doubling capacity beneath the Elizabeth River.
Huge precast tunnel segments were cast using self-consolidating concrete and slag cement, and then floated 220 miles to the construction site.