T.Y. Lin International (TYLI) is pleased to announce the completion of the closure segment on the 760-foot main span of the Kanawha River Bridge, a new segmental bridge over the Kanawha River between Dunbar and South Charleston, West Virginia.
Traversing the Brunswick River, the new 2500-foot-long Sidney Lanier Bridge is the longest and tallest cable-stayed bridge in Georgia. T.Y. Lin International designed the concrete alternative, which replaces a 1956 lift-span bridge.