Doka’s custom formwork solutions and the good teamwork between Doka and Strabag made this project a success.
Southeast Collector Trunk Sewer Project
Custom Top 50 can be constructed to accommodate any wall design and produces excellent final results as depicted here.
Southeast Collector Trunk Sewer Project
Doka supplied custom benching formwork for 13 ventilation shafts, ranging between 10 to 60m depth.
Southeast Collector Trunk Sewer Project
Using custom Top 50 formwork panels allowed Strabag to pour the U-shaped benching at the bottom of each ventilation shaft connecting the newly drilled tunnel opening with each other.
Southeast Collector Trunk Sewer Project
Doka secured this project due to their expertise in 3D engineering design and custom-built formwork solutions.
Southeast Collector Trunk Sewer Project
Each custom formwork element was preassembled in Toronto.