Designed specifically for industrial floor applications receiving heavy vehicle traffic, such a forklift or steel-wheeled carts. Recommended concrete cure a minimum of 28 days prior to installing joint filler. SL/75 is accommodating to small slab movement yet strong enough to protect the vertical edges of concrete from spalling under extreme loading.

VersaFlex Inc.
More Decorative and Concrete Surfaces

More about VersaFlex Inc
Find products, contact information and articles about VersaFlex Inc