10,000 sq. ft. of the high school main corridors were ground to expose large aggregate. Brass strips were saw-cut and installed in the floor using clear epoxy. The floor was then ground using Vexcon Fusion to close surface cracks and tighten up concrete to the brass strips. The floor was then stained in multiple colors using Vexcon Micro stain and was then ground to an 800-grit finish. The finish coat was applied and burnished to achieve an FSR floor system.